MEP engineering
Retail
Nike Store, Arribat Center
View project
MEP engineering
Power, low-current systems, air conditioning, fire safety.
A building runs on four networks that people notice only when they fail. We design them together, so that they fit in the same ceiling void and stay coordinated on site.
01The four packages
- Electrical power: distribution, lighting, socket outlets
- Low-current systems: data networks, access control, public address
- HVAC: heating, ventilation and air conditioning, smoke extraction, air distribution
- Fire safety: fire detection and sprinkler network
References
Projects in this field
All projects
MEP engineering
Retail
Nike Store, Arribat Center
View project
MEP engineering
Retail
Crocs, Tanger Mall
View project
Our office174 boulevard Zerktouni · 7th floor
Contact
